Jump to content

Project Dt 125


Dtr1991
This post is 4423 days old and we'd rather you create a new post instead of adding to this one. You can't reply in this post.

Recommended Posts

Hello just thought id post my current project witch i bought a few months back i paided 100 pound for her and it had been sat up for 3 years in somes back garden rotting away so i decided to strip and rebulid from the ground up here is a picture when i bought it

IMG00010-20120201-1458.jpg

so thats it he had the v5 and everything so at 100 pound a bargin it didnt run at all when i had it due to sum vandals trying to steal it :( everything was stiff and seesed up so first thing i tried was to get it running after half hour with messing about with the loom i got it running not that i was very nice when it did lol .

limited pictures atm

after stripping i had the frame powerd coated

IMG-20120405-00024.jpg

After the powerd coating the swing arm and frame cost me 90 pound for the lot :) well happy but at this point this is when it hit me how much wud need replacing were it was just so rusty worn out !

IMG-20120419-00043.jpg

after all bearings changed i put it back onto its wheels at it was much easier working at this level changed gaotors for the sleaves made it look a bit more up to date and id never used them before so thought i would give them a try i changed the head set bearing from the loose to the full races alot eaier to work with than seprate bearing lol

IMG-20120419-00044.jpg

another picture of when it was back on wheels mind it wasnt all bolts tighten up just all loose together just to make sure its all fitted together nicely alot of cleaning and replacing but well worth it even at this stage :)

Link to comment
Share on other sites

Do you want an ad-free experience? Join today and help support the Yamaha Owners Club.

looking good.

Link to comment
Share on other sites

As said, looking good! Is it complete now or is this the stage you are at? I'm working on a DT125R too at the moment. My eventual plan is to start from the ground up with one of the frames I have. The current one will probably be sold once I've completed it to pay for the next one. Keep up the photos and info!

Link to comment
Share on other sites

IMG-20120426-00047.jpg

this was when the fully rebuilt engine was fitted after all bearings piston rings plus a rebore was done the clutch side casing was changed from the older one one reason as i wanted the newer oil pump fitted rather than the older one so it came from a 2005 re and was mint all new gaskets fitted

Link to comment
Share on other sites

IMG-20120426-00049.jpg

better picture at this stage rad was fitted along side the oil tank i bought a second had dep pipe had a standard one on it rusted to hell ! and these provide a proper de ristriction look and sound sooo much better aswell two refurbed calipers fitted along with the resprayed footpegs and the rear brake foot pedal water pipes to rad

Link to comment
Share on other sites

nice!

Link to comment
Share on other sites

IMG-20120519-00003.jpg

At this point the airbox was fitted and cleaned the loom along with the cdi also the clocks with the headlight stay and headlight but was finding great difficult finding a dep rear box lol took 3 weeks before a mint one came up ebay for a good price , as when i was putting it back together 60 percent off the stuff i took off i didnt want them back onto the bike so i bought mint second hand or new as buy everything new would cost a bomb as some of u guys may no lol

Link to comment
Share on other sites

IMG-20120526-00005.jpg

at this point my new renthal bars arrived :) as the old ones i hated along with all new leavers grips and all bolts replaced with allen key replacements 2 reason look 100 times betta and it seem yamaha make there bolt out of clay lol as they have a real nack of rounding off so a impact driver comes in real handy :)

Link to comment
Share on other sites

IMG-20120531-00011-1.jpg

This point its really comming together finally found a dep rear box 40 pounds bargin !! also all the oil oump fitted and swapped all tubes to blue clear sillicone tubes as it looks betta and you can allways see the pump working :) stops it heat seizing carb fitted with new over flow pipes in blue again and all polished and cleaned up

Link to comment
Share on other sites

IMG-20120531-00012.jpg

same stage diffrent angle but thinking about cutting the backbox down and making a stubby as they seem to hang out abit to far and the subbys sound and look better :)

Link to comment
Share on other sites

This is the stage im at now the colours im goin for is black frame and pure white pannels iv ordered the pannels for the whole set bar headlight cowl was £136 posted in any colour so not bad and was the only place i could reli find them iv allso made a custom tail from a standard one so the tail tidy would fit properly just small job left but lots of them bleeding filling with fluids checking for any possible leaks witch there shouldnt be new chain and sprockets ordered new air filter spark plugs brake pads etc etc and make the one probem im having is with the loom as im thinking about replacing it any info any one needs or issues that had or having with there rebuild im happy to help as best to my knoledge guys cheers

Link to comment
Share on other sites

yeah yeah the guy was really helpful in ordering them well i as you know a 1991 engine had the older casing with the old school pump i replaced the whole thing from a 2005 re and 2005 re pump and fitted stright on so it would work either way

Link to comment
Share on other sites

  • Who's Online (See full list)

    • There are no registered users currently online
  • Recently Browsing

    • No registered users viewing this page.
×
×
  • Create New...